DENIOS Ltd
Audley Ave Enterprise Park
Nova House, Suite 1
Newport, Shropshire
TF10 7DW

Tel.: +44 1952 811991
Email: info@denios.co.uk
Internet: www.denios.co.uk

Brass immersion cylinder Ex, for target point samples and soil samples

Item number: 281230W

  • Ideal for target point samples or soil samples
  • For sampling crude oils, liquid mineral oil products, fuels, special and test fuels, heating oils, petroleum and liquid lubricants according to explosion groups IIA, IIB and IIC
  • Unscrewable upper part ensures easy cleaning
  • High weight for fast lowering
  • Sturdy handle
  • Tested for use in explosion protection zones 0 and 1, explosion classes II A, II B and II C
  • Target point test application: Two lowering ropes are required (one as a suspension rope and one as a pull rope) 1. Lower the immersion cylinder to the desired depth. 2. Pull the rope, the valve opens. 3. The sample flows into the immersion cylinder. 4. Release the pull rope, the valve closes automatically, pull the immersion cylinder back on the suspension rope 5. Empty the immersion cylinder via the bottom valve.
  • Soil sample application: 1. Lower the immersion cylinder on the rope to the bottom. 2. The valve opens automatically due to the weight of the immersion cylinder. 3. The sample flows into the immersion cylinder. 4. Pull the immersion cylinder back on the rope, the valve closes automatically 5. Empty the immersion cylinder via the bottom valve
Full description
£636.00 Excl. VAT

Free shipping to Mainland U.K.

Shipping Time: 1 - 2 weeks

New
SALE
bestseller
[[record.name]]
[[record.actionPrice]] [[record.price]] [[record.price]] Excl. VAT
Price on request

New
SALE
bestseller
[[record.name]]
[[record.actionPrice]] [[record.price]] [[record.price]] Excl. VAT
Price on request

Product description

  • Ideal for target point samples or soil samples
  • For sampling crude oils, liquid mineral oil products, fuels, special and test fuels, heating oils, petroleum and liquid lubricants according to explosion groups IIA, IIB and IIC
  • Unscrewable upper part ensures easy cleaning
  • High weight for fast lowering
  • Sturdy handle
  • Tested for use in explosion protection zones 0 and 1, explosion classes II A, II B and II C
  • Target point test application: Two lowering ropes are required (one as a suspension rope and one as a pull rope) 1. Lower the immersion cylinder to the desired depth. 2. Pull the rope, the valve opens. 3. The sample flows into the immersion cylinder. 4. Release the pull rope, the valve closes automatically, pull the immersion cylinder back on the suspension rope 5. Empty the immersion cylinder via the bottom valve.
  • Soil sample application: 1. Lower the immersion cylinder on the rope to the bottom. 2. The valve opens automatically due to the weight of the immersion cylinder. 3. The sample flows into the immersion cylinder. 4. Pull the immersion cylinder back on the rope, the valve closes automatically 5. Empty the immersion cylinder via the bottom valve

Quality features

Technical data

Version Tauchgefäße
Volume [l] 0.5
Diameter, external [mm] 75
Height, external [mm] 300
Material Nickel-plated brass
Design Reusable
Placement 1 immersion cylinder brass 500 ml without lowering rope
Can be used in Ex zones Zones 0, 1 IIA, IIB, IIC
Weight [kg] 3,03
Brand Bürkle

Documents

Do you need help?
We work hard to give you good advice.
Free expert advice 01952 811 991

Mon-Thu: 8:30am – 5:00pm
Fri: 8:30am – 4:00pm

Free delivery

to Mainland U.K.

Spare parts and maintenance service

Everything from one source: We offer a spare parts and maintenance service.

DENIOS Warranty

up to 10 years

Menu
Log in
Added to basket
Go to basket
We would be pleased to provide you with advice!

Give us a call or fill out the form and we will get back to you as soon as possible.

Mon - Thu: 08:30 - 17:00 | Fri: 08:30 - 16:00

Use code DEN10 at checkout for 10% off ALL of our catalogue products. Cannot be combined with other promotions, discounts or other special prices. Does not apply to open quotations. IMPORTANT: our warehouse will close on the 17th of December, with the last date for dispatch being the 16th. It will reopen on the 2nd of January 2025.