Item number: 274977W
The structural calculations for the technical room system are based on Eurocode 3 (EN 1993). The loads on the structure are measured according to Eurocode 1 (EN 1991-1-3) for a characteristic wind load qk,w = 0.585 kN/m² and a ground snow load sk = 2.5 kN/m². The structure is also designed for earthquake zone 3 according to EN 4149, EN 1998-1:2004. With additional equipment up to wind load zone 4 with terrain category I (qk,w = 1.064 kN/m²) or up to ground snow load sk = 5.86 kN/m².
Roof drainage channels rain water to the frame running around the edge and drains it away on the short sides either to the left or the right.
Full descriptionThe structural calculations for the technical room system are based on Eurocode 3 (EN 1993). The loads on the structure are measured according to Eurocode 1 (EN 1991-1-3) for a characteristic wind load qk,w = 0.585 kN/m² and a ground snow load sk = 2.5 kN/m². The structure is also designed for earthquake zone 3 according to EN 4149, EN 1998-1:2004. With additional equipment up to wind load zone 4 with terrain category I (qk,w = 1.064 kN/m²) or up to ground snow load sk = 5.86 kN/m².
Roof drainage channels rain water to the frame running around the edge and drains it away on the short sides either to the left or the right.
Model | WFP-X 6 Li-Ion Charge |
Dimensions (without attachments) W x D x H [mm] | 3018 x 2784 x 2875 |
Internal dimensions W x D x H [mm] | 2580 x 2560 x 2500 |
Storage area [m²] | 6 |
Door version | hinged door |
Insulation | Heat insulation |
Fire resistance | 90 minutes 120 minutes |
Load capacity [kg/m²] | 1000 |
Containment volume [l] | 930 |
Internal room height [mm] | 2500 mm |
Weight [kg] | 2550 |
Mon - Thu: 08:30 - 17:00 Fri: 08:30 - 16:00
Give us a call or fill out the form and we will get back to you as soon as possible.
Use code DEN10 at checkout for 10% off ALL of our catalogue products. Cannot be combined with other promotions, discounts or other special prices. Does not apply to open quotations. IMPORTANT: our warehouse will close on the 17th of December, with the last date for dispatch being the 16th. It will reopen on the 2nd of January 2025.