DENIOS Ltd
Audley Ave Enterprise Park
Nova House, Suite 1
Newport, Shropshire
TF10 7DW

Tel.: +44 1952 811991
Email: info@denios.co.uk
Internet: www.denios.co.uk

Fire-rated storage container RFP 115-2

Item number: 274736W

  • The space saving solution for storage of hazardous substances near to production, or decentralised, if required for safety or logistical reasons.
  • For the safe storage, dispensing or removal of flammable and water-polluting substances.
  • Install directly next to the external wall of neighbouring buildings or as a fire-rated separate area, e.g. in a production hall. Exception: peroxide stores.
  • Steel spill pallet with removable hot dip galvanised grids (max. load capacity: 1,250 kg/m²).
  • Long-lasting corrosion protection with fully-galvanised base material and high-quality 2K paint (RAL 9002, grey-white).
  • Fire protection panels (A class material, non-combustible) with high insulation properties.
  • Lockable, self closing 1-wing fire-rated EI₂ 90-C door to EN 13501-2, tested in accordance with EN 1634-1, or country-specific design (EI₁ 60 or EI₂ 120) with a door opening angle of 90 ° / 115 °.
  • If required with up to three additional shelves.

Structural analysis

The structural calculations for the technical room system are based on Eurocode 3 (EN 1993). The loads on the structure are measured according to Eurocode 1 (EN 1991-1-3) for a characteristic wind load qk,w = 0.585 kN/m² and a ground snow load sk = 2.5 kN/m². The structure is also designed for earthquake zone 3 according to EN 4149, EN 1998-1:2004. With additional equipment up to wind load zone 4 with terrain category I (qk,w = 1.064 kN/m²) or up to ground snow load sk = 5.86 kN/m².

Roof drainage

The roof drainage counteracts loads from standing water on the roof. The rainwater is directed via the roof profile to the two short sides of the room and is channeled to an outlet either through the right or left corner profile or through both. From there, it can be directed to a drainage system on site, e.g. via a drainage pipe.

Prerequisites for storing flammable liquids

(Flashpoint ≤ 60 °C, classified as H226, H225 or H224)

  • Create equipotential bonding (earthing) (connection point provided); if required provide lightning protection
  • Country-specific requirements for air exchange rate
  • Specifications in accordance with HSG71
  • Specifications in accordance with ATEX Directive 2014/34/EU
Full description
We work hard to give you good advice.
Do you need help?
We work hard to give you good advice.
Free Expert Advice01952 811991

Mon - Thu: 08:30 - 17:00 Fri: 08:30 - 16:00

New
SALE
bestseller
[[record.name]]
[[record.actionPrice]] [[record.price]] [[record.price]] Excl. VAT
Price on request
New
SALE
bestseller
[[record.name]]
[[record.actionPrice]] [[record.price]] [[record.price]] Excl. VAT
Price on request

Product description

  • The space saving solution for storage of hazardous substances near to production, or decentralised, if required for safety or logistical reasons.
  • For the safe storage, dispensing or removal of flammable and water-polluting substances.
  • Install directly next to the external wall of neighbouring buildings or as a fire-rated separate area, e.g. in a production hall. Exception: peroxide stores.
  • Steel spill pallet with removable hot dip galvanised grids (max. load capacity: 1,250 kg/m²).
  • Long-lasting corrosion protection with fully-galvanised base material and high-quality 2K paint (RAL 9002, grey-white).
  • Fire protection panels (A class material, non-combustible) with high insulation properties.
  • Lockable, self closing 1-wing fire-rated EI₂ 90-C door to EN 13501-2, tested in accordance with EN 1634-1, or country-specific design (EI₁ 60 or EI₂ 120) with a door opening angle of 90 ° / 115 °.
  • If required with up to three additional shelves.

Structural analysis

The structural calculations for the technical room system are based on Eurocode 3 (EN 1993). The loads on the structure are measured according to Eurocode 1 (EN 1991-1-3) for a characteristic wind load qk,w = 0.585 kN/m² and a ground snow load sk = 2.5 kN/m². The structure is also designed for earthquake zone 3 according to EN 4149, EN 1998-1:2004. With additional equipment up to wind load zone 4 with terrain category I (qk,w = 1.064 kN/m²) or up to ground snow load sk = 5.86 kN/m².

Roof drainage

The roof drainage counteracts loads from standing water on the roof. The rainwater is directed via the roof profile to the two short sides of the room and is channeled to an outlet either through the right or left corner profile or through both. From there, it can be directed to a drainage system on site, e.g. via a drainage pipe.

Prerequisites for storing flammable liquids

(Flashpoint ≤ 60 °C, classified as H226, H225 or H224)

  • Create equipotential bonding (earthing) (connection point provided); if required provide lightning protection
  • Country-specific requirements for air exchange rate
  • Specifications in accordance with HSG71
  • Specifications in accordance with ATEX Directive 2014/34/EU

Technical data

ModelRFP 115-2
Clear bay depth [mm]1560
Dimensions (without attachments) W x D x H [mm]1976 x 1784 x 2629
Bay dimensions W x D x H [mm]1538 x 1560 x 2333
Door versionhinged door
Door design1-wing
Fire resistanceF90/REI90
REI 120
Load capacity [kg/m²]1250
Containment volume [l]349
ColourGrey white
RAL Code9002
Capacity IBC / CP / EP / drum0 / 1 / 1 / 4
Weight [kg]1075

Documents

Service

We work hard to give you good advice.
Do you need help?
We work hard to give you good advice.
Free Expert Advice01952 811991

Mon - Thu: 08:30 - 17:00 Fri: 08:30 - 16:00

Use code UK10 at checkout and receive 10% off your order!*

*Cannot be combined with other promotions, discounts or other special prices. Does not apply to open quotations.